facebook youtube
sk | en | de | hu

The first part of river branch system in Kralova luka is cleaned and revived

In the middle of May 2016 the first part of Kralova luka branch system was restored in Danube floodplains. With the help of excavator the fallen dead wood and river deposits have been excavated and the water intake from Danube was released.

Before restoration there was only little brooklet in some parts of the river branch of Kralova Luka  (as you can see on the first picture). After restoration the water level was in some parts more that 50 cm. 

The continuation of the Kralova luka restoration will be prepared in later phases of the project. 

Picture no. 1 - Status before realisation (little brooklet in the old river branch with sedimented mud):

Pred realizaciou Kralova luka

 

Picture no.2 - Realisation phase of the project

Realizacia Kralova Luka

 

Pictute no.3 - Status after realization of the project

Kralova Luka po realizácii projektu

 

The restoration was realized within the project activity C.2.

The status after one month June 23, 2016:

Kralova luka June 2016